Langfang Guomei Aluminium Industry Co., Ltd.

Langfang Guomei Aluminium Industry Co., Ltd.

Manufacturer from China
Active Member
5 Years
Home / Products / Building Aluminum Formwork Profiles /

Recycled 3.2M 2MM Aluminium Construction Template Profiles

Contact Now
Langfang Guomei Aluminium Industry Co., Ltd.
City:langfang
Province/State:hebei
Country/Region:china
Contact Person:MrPeter Zhao
Contact Now

Recycled 3.2M 2MM Aluminium Construction Template Profiles

Ask Latest Price
Brand Name :Goomay
Model Number :GM-JZMB-11
Certification :ISO9001:2015 , ISO14001:2015 , ISO45001:2008
Place of Origin :Langfang,Hebei,China
MOQ :MOQ 2000KGS For Initial Order,the quantity could be negotiable
Price :Negotiable
Payment Terms :30%deposit+70% against BL copy, D/P, L/C
Supply Ability :5000T MONTHLY
Delivery Time :After drawings confirmed,4-7days moulds ready , after samples approved , 7-10days delivery for 200TONS
Packaging Details :Inside:packed with protective film to protect each piece. Outside: Bulk Quantity , Thermal Shrinkage Bags , Whole Craft Paper
Product Name :Aluminium Template Profiles , Building Formwork Profiles
Material :China Alminium Origin Ingot 6005-T6 , 6061-T6
Surface Treatment :powder coated as per RAL colour or customized colour
Length :6M - 13M or Customized Length
Wall Thickness :2MM-15MM or Customized Wall Thickness
Characters :Light Weight,Easy-Installation,Recycled
Certificates :ISO9001:2015 , ISO14001:2015 , ISO45001:2008 , Hebei Provincial Qualified Cerificate
Application :Concrete Construction , Real Estate Construction
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Green , Low - Carbon , Energy - Saving And Environmentally - Friendly Aluminium Concrete Formwork System Profiles ,Aluminium constructon Template Profiles

Description

We have adopted a more advanced system. The strength and stiffness of aluminum alloy formwork system can be improved by optimizing the cross section and surface powder spraying treatment of aluminum alloy formwork.

As a result, you will be able to buy higher quality products at lower prices.

Aluminum alloy formwork system

Panel system:

It is made of extruded aluminum alloy profiles (6061-T6, etc.), which is light, high-strength, and good in integrity, so as to ensure convenient installation and repeated turnover of horizontal plates.

Supporting system:

Single support: adopt advanced early dismantling technology support system to ensure that the construction period of each layer structure is controlled within the range of 4 ~ 5 days. Through test verification, the vertical allowable bearing capacity reaches 20 ~ 25KPA.

Bidirectional bracing:

Realize the three-dimensional adjustment function, while ensuring the verticality and flatness of the vertical members (walls, columns), it can strengthen the horizontal rigidity and bearing capacity of the vertical members (walls, columns) to resist the lateral direction caused by pouring concrete pressure.

Attachment system:

Pins, pins, bolts and other hardware accessories are made of high quality products, performance and processing accuracy in accordance with the relevant specifications and customer requirements.

Fastening system:

In the range of conventional height (2.8 ~ 3.2M), the rear flute system adopts the design principle of locally reinforcing 4 parts of the inner wall, 5 parts of the outer wall, openings and floating platforms, etc., to ensure the overall strength, stiffness and stability of the formwork system.

Construction advantages


1. Good system integrity


The overall casting is sub-molded, and the structure is safer.


2. High construction efficiency and short construction period


Only one set of template is needed for the early mold removal system.

3. Good construction quality

High quality concrete shapes: high precision in verticality, flatness, levelness and section size.

The concrete surface has a good look and feel: the effect of white concrete can be achieved without plastering.

4. Reduce the use of vertical transport machinery

Lifting equipment is used except for the first template going upstairs and the last time coming downstairs, and all subsequent manual transfers are used.


5. Solve the shortage of skilled workers on the construction site


The installation is simple, and the general workers can carry out the installation of aluminum formwork after simple training.


6. Safe and civilized construction


The support system is simple and convenient, with large on-site operation space, personnel movement, smooth material handling, clean and safe construction surface.
There is no construction waste, no need to store and clean up, and the construction site is easy to manage.

Economic benefits

The biggest cost advantage of the aluminum alloy formwork system is that it can be reused many times. At present, the standard template has been used more than 300 times. Damaged templates can be recycled and re-cast.

At the same time, due to the high forming quality of aluminum formwork, the plaster-free effect can be achieved, which saves a lot of labor costs in the production, transportation and plastering of cement, sand, water and mortar, and brings economic benefits, which become more obvious with the increase of reuse times.


Save the use of river sand and protect water and land resources.

Due to the high forming quality of the aluminum alloy template, the effect of avoiding plastering can be achieved, and a large amount of cement, sand, water and mortar production, transportation and plastering labor costs are saved.

Reduce wood consumption and protect forest resources.

Aluminum alloy templates can be reused many times. After damage, it can be returned to the furnace and remelted. All of these can be reused, which greatly reduces wood waste.


Caring for life and paying attention to safety.

Achieve safe and civilized low-carbon construction and reduce site safety accidents.


Improve efficiency and reduce energy consumption.

The use of aluminum alloy formwork has high construction efficiency and reduces energy consumption in building construction.

Product Parameters

Product Name Aluminium Template Profiles, Building Formwork Profiles
Material China Alminium Origin Ingot 6005-T6 , 6061-T6 More toughness
Surface Treatment Mill Finish , Anodized Silver High corrosion resistance
Characters Light Weight, Easy-Installation, Recycled Save time and manpower
Certificates ISO9001:2015 , ISO14001:2015 , ISO45001:2008 National quality certification
Application Concrete Construction , Real Estate Construction

Inquiry Cart 0